. A tunnel is caved in on Moffat road and no freight can get through earlier than the 17th. Perhaps it will take much longer. Nothing definite can be said now but will get freight here as soon as possible. Later, [Toner? Turner?] of the Moffat says (wires) car cannot be held but instructs to unload on Platform and then load cars from the platform. I am inclined to think it would be cheaper for us to pay demurrage if not too long. I will probably come in again with first or second truck haul, and will then know better what to do Douglass